107 Sinclair Blvd
site plan, consent (land division), zoning by-law amendment
“Proposing site plan revisions including relocating the loading and garbage area, converting parking spaces to landscaped amenity areas, shifting Building 1 by 6 m, removing a rear walkway, and refining setbacks and easement distances.”
Where it stands
Stage from the City of Brantford’s status, November 28, 2026Filed with the municipality and being reviewed.
How we know
Last checked November 28, 2026City of BrantfordHow we know
- Publisher
- City of Brantford
- Source dataset
- Planning Application Open Data view (City of Brantford)
- Retrieved
- November 28, 2026
- Licence
- City of Brantford data — used with the City's permission (owner record, 2026-11-28) Terms
- From the source
- the project and application names · file numbers · status · dates where recorded · the description of the proposal
- Derived by BrantfordIQ
- the stage label · grouping of linked applications into one project · area and ward by the site's location · what is nearby · the zoning diagram, from the zoning layer's polygons around the recorded point
- BrantfordIQ’s words
- the summary sentence
- Kept current
- Rebuilt from the municipality's source by the data pipeline; each run is dated, and changes between runs are listed on the changes page.
Proposed, in the record's words: “Proposing site plan revisions including relocating the loading and garbage area, converting parking spaces to landscaped amenity areas, shifting Building 1 by 6 m, removing a rear walkway, and refining setbacks and…”. Latest dated step on the record: deemed complete, July 30, 2026. Files SPC-12-26, B10-2024. As of November 28, 2026 · City of Brantford
Data currency. Read from the City of Brantford source on November 28, 2026. The source was last edited November 23, 2026. Newest date on any record: November 10, 2026. Planning Application Open Data view (City of Brantford)
What is being asked
107 Sinclair Blvd is the site of 4 applications on the City of Brantford's record (site plan, consent (land division), zoning by-law amendment) in Ward 4. It is under review and has not been decided.
What is proposed
Proposing site plan revisions including relocating the loading and garbage area, converting parking spaces to landscaped amenity areas, shifting Building 1 by 6 m, removing a rear walkway, and refining setbacks and easement distances.
Proposing to sever the current lot, retaining the land with an existing industrial building, and constructing a 3-story office building on the severed lot.
Proposing the construction of two three-story office buildings, complete with a dedicated parking area. The total ground floor area across both buildings will be 3818 sq. m., and the gross floor area is 11594 sq. m.
Requesting the removal of the Holding Provision on the subject lands to allow for the development of two three-story office buildings, each with a gross floor area of 5,727 m².
The City of Brantford’s description of the applications, as published.
The 4 applications
The source links these records to one another (the same planning file or the same site), so they are shown as one project. Each is listed as the municipality records it.
Site plan
SPC-12-26
- Type
- Site plan (Site plan approval)
- Status on the record
- In circulation
- Received
- July 2, 2026
- Deemed complete
- July 30, 2026
- Proposed use (City's words)
- Industrial
Consent (land division)
B10-2024
- Type
- Consent (land division) (Consent)
- Status on the record
- Finished
- Received
- January 4, 2024
- Deemed complete
- January 26, 2024
Site plan
SPC-14-24
- Type
- Site plan (Site plan approval)
- Status on the record
- Finished
- Received
- May 13, 2024
- Deemed complete
- June 5, 2024
- Proposed use (City's words)
- Commercial
Zoning by-law amendment
PZ-08-25
- Type
- Zoning by-law amendment (Rezoning)
- Status on the record
- Finished
- Received
- March 20, 2025
- Deemed complete
- April 16, 2025
- Proposed use (City's words)
- Removal of a Holding Provision
Filings since 2024
Deemed complete
Site plan · SPC-12-26 · 2026
Application received
Site plan · SPC-12-26 · 2026
Deemed complete
Zoning by-law amendment · PZ-08-25 · 2025
Application received
Zoning by-law amendment · PZ-08-25 · 2025
Deemed complete
Site plan · SPC-14-24 · 2024
Application received
Site plan · SPC-14-24 · 2024
Deemed complete
Consent (land division) · B10-2024 · 2024
Application received
Consent (land division) · B10-2024 · 2024
The record shows nothing dated after July 30, 2026; the next recorded step appears here when the municipality enters it.
Every date in the municipality’s record for this project’s applications, in order. Nothing is inferred between them.
Other projects within 1 km
Development in Ward 4- This project
- Under review (2)
- 1 km
- 112 Adams BlvdStage: Under reviewSite plan · Ward 4 · 640 m
- 375 Garden AveStage: Under reviewZoning by-law amendment · Ward 4 · 940 m
Statuses as the City of Brantford publishes them; distances straight-line from the file’s recorded point · November 28, 2026
Around the site
Parks nearby
- Forest in the City210 m
Schools, heritage and transit
Nearest schools
- Notre Dame School · elementary school · 1.8 km
- Branlyn Community School · elementary school · 1.9 km
- Woodman-Cainsville · elementary school · 2.6 km
Distances are between recorded positions, as the crow flies, not walking routes.
What the stages mean
- Stage: Pre-application
- Proposed to the municipality, but a complete application has not yet been received.
- Stage: Under review
- Filed with the municipality and being reviewed.107 Sinclair Blvd is here.
- Stage: Under appeal
- A decision, or the lack of one, has been appealed to the Ontario Land Tribunal.
- Stage: On hold
- The municipality lists the application as on hold, for example while it waits for more material.
- Stage: Approved
- The application has been approved. Building may not have started.
- Stage: Complete
- Final approval has been given or the plan has been registered.
- Stage: Closed
- The municipality has closed this application file. The record lists what was recorded.
- Stage: Refused
- The application was refused.
Sources
- 01Planning Application Open Data view (City of Brantford) — checked November 28, 2026
Contains information provided by the City of Brantford City of Brantford data — used with the City's permission (owner record, 2026-11-28). Figures are the municipality’s records at the date checked; a later submission can change them.
How we draw the diagram
The shapes are the City’s zoning-layer polygons within about 140 m of the file’s recorded point, simplified for drawing, with their zone codes as published. The tinted shape is the zone the point falls in today. Streets are the gaps between zones. Nothing in the diagram is the proposal: no building, height or design is drawn.