Major road and bridge projects in Brantford

The big road and bridge projects the City of Brantford is building or planning: the downtown rebuild, the Brant's Crossing and Ava Road bridges, and studies for Powerline and Paris roads.

Summary

The City's biggest road job is the Downtown Revitalization Project, which is replacing aging sewers and watermains and rebuilding the streetscape on Brant Avenue, Icomm Drive, Colborne, Dalhousie and Hill streets, with Phase 1 due to finish in late December 2026. The Brant's Crossing trail bridge over the Grand River is being replaced, the Ava Road Bridge reopened in 2025, and studies are looking at added capacity on Powerline Road and on Paris Road and Golf Road.

Last verified

Administered by The City of Brantford plans, designs and builds roads and bridges on City streets. Every answer below was checked against its source on November 27, 2026; the source is linked under each one.


Downtown Revitalization

What is the Downtown Revitalization Project?

It is the City's rebuild of downtown Brantford's streets. The underground sanitary sewers, storm sewers and watermains are reaching the end of their life and are being replaced with larger ones that allow for future growth, and the streets above get new sidewalks, street furniture and wayfinding signs to make downtown more attractive, accessible and safe for pedestrians, cyclists, transit riders and drivers. Design began in January 2024, and the project is funded in part by the Government of Canada.

Source: City of Brantford, Downtown Revitalization Project

Which streets are in Phase 1, and when will it finish?

Phase 1 started in 2025 on Brant Avenue (Colborne Street to Dalhousie Street) and Icomm Drive (Colborne Street to Clarence Street South), and in 2026 added Dalhousie Street (Brant Avenue to Bridge Street), Colborne Street (Brant Avenue to King Street) and Hill Street (Icomm Drive to Water Street). The City's November 25, 2026 update said the work was tentatively set to finish in late December 2026, weather permitting.

Source: City of Brantford, Downtown Detours


Bridges

What is happening to Brant's Crossing Bridge?

The City is replacing the bridge's superstructure. The former railway bridge carries the Dyke Trail over the Grand River between Fordview Park and Brant's Crossing Park; the new deck is wider, raised at least 1.1 metres to resist flooding and ice jams, and adds lighting and two lookouts. Construction began in spring 2025, the old spans came out in fall 2025 and the new ones went in during spring 2026. The City's project page says completion is anticipated in fall 2026, and the bridge stays closed until then.

Pedestrians and cyclists are detoured over the Lorne Bridge to the north and the TH&B Bridge near Earl Haig Family Fun Park to the south.

Source: City of Brantford, Brant's Crossing Bridge Replacement

Is the Ava Road Bridge open?

Yes. The bridge, which carries Brant Avenue over the CN tracks between Paris Road and Brant Avenue, closed in late May 2024 for a full rehabilitation and reopened to through traffic on June 13, 2025. The underpass, which lets westbound Brant Avenue traffic reach Ava Road, reopened on July 23, 2025. An earlier phase realigned the Paris Road and Terrace Hill Street intersection in 2019.

Source: City of Brantford, Ava Road Bridge Rehabilitation Project


Projects in planning

Is Powerline Road going to be widened?

The City is studying it. A Municipal Class Environmental Assessment (Schedule C) is looking at improvements to Powerline Road from Paris Road to the east city boundary, because the 2020 Transportation Master Plan forecasts most of the road approaching or exceeding capacity at peak times. The study covers capacity, safety, cycling and walking, and intersection designs including possible roundabouts. Public information centres were held in July 2024 and August 2025; an Environmental Study Report will be released for review at the end of the study.

Source: City of Brantford, Powerline Road Transportation Capacity Environmental Assessment

What is the Paris Road and Golf Road study?

It is a pair of City environmental assessments, run together: a Schedule C study of improvements to Paris Road and Golf Road near Highway 403 and the CN rail line, and a Schedule B study to extend a trunk watermain in the same area. Public information centres were held on November 28, 2024 and November 6, 2025 at the Walter Gretzky Municipal Golf Course; questions go to ParisGolfRoadEA@brantford.ca.

Source: City of Brantford, Paris Road-Golf Road and Trunk Watermain Environmental Assessment Studies

Sources

Every factual claim above traces to one of these documents.

  1. City of Brantford

    Downtown Revitalization Project

    Retrieved November 27, 2026

  2. City of Brantford

    Downtown Detours

    Retrieved November 27, 2026

  3. City of Brantford

    Brant's Crossing Bridge Replacement

    Retrieved November 27, 2026

  4. City of Brantford

    Ava Road Bridge Rehabilitation Project

    Retrieved November 27, 2026

  5. City of Brantford

    Powerline Road Transportation Capacity Environmental Assessment

    Retrieved November 27, 2026