Skip to content
BrantfordIQ
Development application 29T-25501, PZ-11-25 · Ward 5

155 Fifth Ave

plan of subdivision, zoning by-law amendment

Stage: Under reviewOn the record: “In circulation; In review”Filed April 17, 2025
“Proposing a residential development consisting of 275 dwelling units, including 150 condominium townhouses, 110 street townhouses, and 15 single-detached dwellings.”
The City of Brantford’s description, in its own words · checked November 28, 2026

Where it stands

Stage from the City of Brantford’s status, November 28, 2026

Filed with the municipality and being reviewed.

Diagram of the zoning around 155 Fifth AveThe municipality's zoning polygons within about 140 metres of the file's recorded point; the point falls in a zone coded H20-RMR. A diagram, not to scale and not a survey: no building or design is drawn.NLR (F15 A450 C35)RMR-77Diagram, not to scaleCity of Brantford zoning and planning open data
Zoning areas around the site; the recorded point falls in H20-RMR today, which is the zone, not the proposal. Streets show as the gaps between zones. No building or design is drawn. File 29T-25501.
2
applications in this project: plan of subdivision, zoning by-law amendment
City of Brantford record
3
dated steps on the record; the latest June 20, 2025
Checked November 28, 2026
1
other significant file within 1 km
City of Brantford record
How we know
Last checked November 28, 2026City of BrantfordHow we know
Publisher
City of Brantford
Source dataset
Planning Application Open Data view (City of Brantford)
Retrieved
November 28, 2026
Licence
City of Brantford data — used with the City's permission (owner record, 2026-11-28) Terms
From the source
the project and application names · file numbers · status · dates where recorded · the description of the proposal
Derived by BrantfordIQ
the stage label · grouping of linked applications into one project · area and ward by the site's location · what is nearby · the zoning diagram, from the zoning layer's polygons around the recorded point
BrantfordIQ’s words
the summary sentence
Kept current
Rebuilt from the municipality's source by the data pipeline; each run is dated, and changes between runs are listed on the changes page.

Proposed, in the record's words: “Proposing a residential development consisting of 275 dwelling units, including 150 condominium townhouses, 110 street townhouses, and 15 single-detached dwellings”. Latest dated step on the record: deemed complete, June 20, 2025. Files 29T-25501, PZ-11-25. As of November 28, 2026 · City of Brantford

Data currency. Read from the City of Brantford source on November 28, 2026. The source was last edited November 23, 2026. Newest date on any record: November 10, 2026. Planning Application Open Data view (City of Brantford)

What is being asked

2 applications

155 Fifth Ave is the site of 2 applications on the City of Brantford's record (plan of subdivision, zoning by-law amendment) in Ward 5. It is under review and has not been decided.

What is proposed

Proposing a residential development consisting of 275 dwelling units, including 150 condominium townhouses, 110 street townhouses, and 15 single-detached dwellings.

Proposing the development of a condominium that will feature 110 three-storey townhouses and 150 back-to-back townhouses, and 15 single-detached dwellings resulting in a total of 275 units throughout the

The City of Brantford’s description of the applications, as published.

The 2 applications

The source links these records to one another (the same planning file or the same site), so they are shown as one project. Each is listed as the municipality records it.

  1. Plan of subdivision

    29T-25501

    Type
    Plan of subdivision (Subdivision)
    Status on the record
    In circulation
    Received
    April 17, 2025
    Deemed complete
    June 20, 2025
    Proposed use (City's words)
    Subdivision
  2. Zoning by-law amendment

    PZ-11-25

    Type
    Zoning by-law amendment (Rezoning)
    Status on the record
    In review
    Received
    June 9, 2025
    Deemed complete
    June 20, 2025
    Proposed use (City's words)
    Residential

Filings since 2025

Every dated item on the record
Dated steps on the record for 155 Fifth Ave2025-04-17: Application received (Plan of subdivision); 2025-06-09: Application received (Zoning by-law amendment); 2025-06-20: Deemed complete (Plan of subdivision, Zoning by-law amendment).2025-04-17: Application received2025-06-09: Application received2025-06-20: Deemed complete
  1. Deemed complete

    Plan of subdivision, Zoning by-law amendment · 29T-25501, PZ-11-25 · 2025

  2. Application received

    Zoning by-law amendment · PZ-11-25 · 2025

  3. Application received

    Plan of subdivision · 29T-25501 · 2025

The record shows nothing dated after June 20, 2025; the next recorded step appears here when the municipality enters it.

Every date in the municipality’s record for this project’s applications, in order. Nothing is inferred between them.

Other projects within 1 km

Development in Ward 5
155 Fifth Ave and other planning files within 1 km155 Fifth Ave (ringed) and 1 other significant file on the City of Brantford's record within 1 km, over the zoning layer.0 Baldwin Ave · Under review · 880 m1 km around the siteCity of Brantford open data
  • This project
  • Under review (1)
  • 1 km
  • 0 Baldwin Ave
    Plan of subdivision · Ward 5 · 880 m
    Stage: Under review

Statuses as the City of Brantford publishes them; distances straight-line from the file’s recorded point · November 28, 2026

Around the site

155 Fifth Ave
Aerial view of 155 Fifth Ave, Brantford
Contains information licensed under the Open Government Licence – Ontario

Parks nearby

Community facilities nearby

Schools, heritage and transit

Nearest schools

Heritage register properties nearby(within 1.0 km, as the crow flies)

4 more within that distance; all of them.

Distances are between recorded positions, as the crow flies, not walking routes.

What the stages mean

The same words on every BrantfordIQ project
Stage: Pre-application
Proposed to the municipality, but a complete application has not yet been received.
Stage: Under review
Filed with the municipality and being reviewed.155 Fifth Ave is here.
Stage: Under appeal
A decision, or the lack of one, has been appealed to the Ontario Land Tribunal.
Stage: On hold
The municipality lists the application as on hold, for example while it waits for more material.
Stage: Approved
The application has been approved. Building may not have started.
Stage: Complete
Final approval has been given or the plan has been registered.
Stage: Closed
The municipality has closed this application file. The record lists what was recorded.
Stage: Refused
The application was refused.

Sources

  1. 01Planning Application Open Data view (City of Brantford) — checked November 28, 2026

Contains information provided by the City of Brantford City of Brantford data — used with the City's permission (owner record, 2026-11-28). Figures are the municipality’s records at the date checked; a later submission can change them.

How we draw the diagram

The shapes are the City’s zoning-layer polygons within about 140 m of the file’s recorded point, simplified for drawing, with their zone codes as published. The tinted shape is the zone the point falls in today. Streets are the gaps between zones. Nothing in the diagram is the proposal: no building, height or design is drawn.

More