Development application PZ-06-24, 29T-24503 · Ward 1

389 Mount Pleasant Rd

zoning by-law amendment, plan of subdivision

Stage: Under reviewOn the record: “In approval; Approved with conditions”Filed March 28, 2024
“Proposing Phase 3 of a three-phase residential development consisting of three estate lots along Mt. Pleasant Road and 163 internal residential lots.”
The City of Brantford’s description, in its own words · checked November 28, 2026

Where it stands

Stage from the City of Brantford’s status, November 28, 2026

Filed with the municipality and being reviewed.

Diagram of the zoning around 389 Mount Pleasant RdThe municipality's zoning polygons within about 140 metres of the file's recorded point; the point falls in a zone coded H30-GNLR-17. A diagram, not to scale and not a survey: no building or design is drawn.H30-GNLR-16H30-GNLR-16H30-GNLR-16H30-GNLR-17H30-GNLR-17OSDiagram, not to scaleCity of Brantford zoning and planning open data
Zoning areas around the site; the recorded point falls in H30-GNLR-17 today, which is the zone, not the proposal. Streets show as the gaps between zones. No building or design is drawn. File PZ-06-24.
2
applications in this project: zoning by-law amendment, plan of subdivision
City of Brantford record
4
dated steps on the record; the latest September 13, 2024
Checked November 28, 2026
2
other significant files within 1 km
City of Brantford record
How we know
Last checked November 28, 2026City of BrantfordHow we know
Publisher
City of Brantford
Source dataset
Planning Application Open Data view (City of Brantford)
Retrieved
November 28, 2026
Licence
City of Brantford data — used with the City's permission (owner record, 2026-11-28) Terms
From the source
the project and application names · file numbers · status · dates where recorded · the description of the proposal
Derived by BrantfordIQ
the stage label · grouping of linked applications into one project · area and ward by the site's location · what is nearby · the zoning diagram, from the zoning layer's polygons around the recorded point
BrantfordIQ’s words
the summary sentence
Kept current
Rebuilt from the municipality's source by the data pipeline; each run is dated, and changes between runs are listed on the changes page.

Proposed, in the record's words: “Proposing Phase 3 of a three-phase residential development consisting of three estate lots along Mt. Pleasant Road and 163 internal residential lots”. Latest dated step on the record: deemed complete, September 13, 2024. Files PZ-06-24, 29T-24503. As of November 28, 2026 · City of Brantford

Data currency. Read from the City of Brantford source on November 28, 2026. The source was last edited November 23, 2026. Newest date on any record: November 10, 2026. Planning Application Open Data view (City of Brantford)

What is being asked

2 applications

389 Mount Pleasant Rd is the site of 2 applications on the City of Brantford's record (zoning by-law amendment, plan of subdivision) in Ward 1. It is under review and has not been decided.

What is proposed

Proposing Phase 3 of a three-phase residential development consisting of three estate lots along Mt. Pleasant Road and 163 internal residential lots.

Proposing a residential development with single-detached homes, townhouses, a multiple residential block, a stormwater pond, an elementary school, two parks, a natural heritage area, and an expanded road network.

The City of Brantford’s description of the applications, as published.

The 2 applications

The source links these records to one another (the same planning file or the same site), so they are shown as one project. Each is listed as the municipality records it.

  1. Zoning by-law amendment

    PZ-06-24

    Type
    Zoning by-law amendment (Rezoning)
    Status on the record
    In approval
    Received
    March 28, 2024
    Deemed complete
    April 5, 2024
    Proposed use (City's words)
    Residential
  2. Plan of subdivision

    29T-24503

    Type
    Plan of subdivision (Subdivision)
    Status on the record
    Approved with conditions
    Received
    April 4, 2024
    Deemed complete
    September 13, 2024
    Proposed use (City's words)
    Subdivision

Filings since 2024

Every dated item on the record
Dated steps on the record for 389 Mount Pleasant Rd2024-03-28: Application received (Zoning by-law amendment); 2024-04-04: Application received (Plan of subdivision); 2024-04-05: Deemed complete (Zoning by-law amendment); 2024-09-13: Deemed complete (Plan of subdivision).2024-03-28: Application received2024-04-04: Application received2024-04-05: Deemed complete2024-09-13: Deemed complete
  1. Deemed complete

    Plan of subdivision · 29T-24503 · 2024

  2. Deemed complete

    Zoning by-law amendment · PZ-06-24 · 2024

  3. Application received

    Plan of subdivision · 29T-24503 · 2024

  4. Application received

    Zoning by-law amendment · PZ-06-24 · 2024

The record shows nothing dated after September 13, 2024; the next recorded step appears here when the municipality enters it.

Every date in the municipality’s record for this project’s applications, in order. Nothing is inferred between them.

Other projects within 1 km

Development in Ward 1
389 Mount Pleasant Rd and other planning files within 1 km389 Mount Pleasant Rd (ringed) and 2 other significant files on the City of Brantford's record within 1 km, over the zoning layer.299 Mount Pleasant Rd · Under review · 470 m251 Mount Pleasant Rd · Approved · 970 m1 km around the siteCity of Brantford open data
  • This project
  • Under review (1)
  • Approved (1)
  • 1 km

Statuses as the City of Brantford publishes them; distances straight-line from the file’s recorded point · November 28, 2026

Around the site

389 Mount Pleasant Rd
Aerial view of 389 Mount Pleasant Rd, Brantford
Contains information licensed under the Open Government Licence – Ontario

Parks nearby

Schools, heritage and transit

Nearest schools

Heritage register properties nearby(within 1.0 km, as the crow flies)

Distances are between recorded positions, as the crow flies, not walking routes.

What the stages mean

The same words on every BrantfordIQ project
Stage: Pre-application
Proposed to the municipality, but a complete application has not yet been received.
Stage: Under review
Filed with the municipality and being reviewed.389 Mount Pleasant Rd is here.
Stage: Under appeal
A decision, or the lack of one, has been appealed to the Ontario Land Tribunal.
Stage: On hold
The municipality lists the application as on hold, for example while it waits for more material.
Stage: Approved
The application has been approved. Building may not have started.
Stage: Complete
Final approval has been given or the plan has been registered.
Stage: Closed
The municipality has closed this application file. The record lists what was recorded.
Stage: Refused
The application was refused.

Sources

  1. 01Planning Application Open Data view (City of Brantford) — checked November 28, 2026

Contains information provided by the City of Brantford City of Brantford data — used with the City's permission (owner record, 2026-11-28). Figures are the municipality’s records at the date checked; a later submission can change them.

How we draw the diagram

The shapes are the City’s zoning-layer polygons within about 140 m of the file’s recorded point, simplified for drawing, with their zone codes as published. The tinted shape is the zone the point falls in today. Streets are the gaps between zones. Nothing in the diagram is the proposal: no building, height or design is drawn.